3 MMGY Biodiesel

Plant California USA

SCube  Mass Transfer Pvt Ltd was hired to upgrade an existing 3 MMGY Northern California plant to replace older, less productive technologies with the latest technologies available at that time. We did this in 2 phases.

Phase 1
SCube  Mass Transfer Pvt Ltd constructed a methanol recovery tower (called the SRXC-Series) as well as a cold soak system (BD19 Resin System

Phase 2
SCube  Mass Transfer Pvt Ltd built a bleaching and degumming system (BDGM) and built a solid catalyst esterification system.