S–Cube Mass Transfer Pvt Ltd was hired to upgrade an existing 3 MMGY Northern California plant to replace older, less productive technologies with the latest technologies available at that time. We did this in 2 phases.
Phase 1 |
S–Cube Mass Transfer Pvt Ltd constructed a methanol recovery tower (called the SRXC-Series) as well as a cold soak system (BD19 Resin System. |
Phase 2 |
S–Cube Mass Transfer Pvt Ltd built a bleaching and degumming system (BDGM) and built a solid catalyst esterification system. |
Any Queries: chetan@s3dist.in || project@s3dist.in
Copyright © 2024 All Rights Reserved. Powered by S-Cube®